Side of the boat.
Roof peeling
Cabin doors.
Side of the boat rusting and peeling.
Cabin doors undercoated.
Cabin doors double undercoated.
The whole boat red oxided, filled, rubbed down and double undercoated.
The whole boat red oxided, filled, rubbed down and double undercoated different angle.
Roof double glossed.
Bow double glossed.
Bow double glossed different angle.
Stern double glossed.
Side of the boat with the windows sprayed gold.
Bow finished.
Another happy customer :)
Gable end scaffolded out.
Gable end.
Faded doors.
Facscia breaking down.
Windows breaking down.
Window breaking down.
Fascias finished with Sadolins.
Windows finished with Sadolins.
Doors finished with Sadolins.
Gable end of the house finished with Sadolins.
House finished with Sadolins.
Conservatory finished with Sadolins.
Striped wallpaper off.
Striped and rubbed down.
Starting to fill holes and cracks.
Walls filled and prepared.
Striped, rubbed down and starting to fill holes and cracks..
Striped, rubbed down and starting to fill holes and cracks.
Lined walls.
Rubbed down the filler holes and started lining the walls.
Started lining the walls.
Started lining the ceiling.
Finished lining the walls.
Finished painting walls.
Finished painting wood work.
Finished painting walls, ceiling and wood work.
Tapping up fittings.
Washing doors down.
Racking out cracks.
Tapping up cracks.
Filling over the tape.
Half way through painting a door.
1st coats of paint.
Walls and ceilings with finished coats.
Finished lining the walls
Finished painting walls
Finished painting wood work
Kitchen finished.
Tapping up fittings
1st coat cutting in.
1st coat on walls.
Finished coats on all the walls.
Cracking Walls.
Cracking walls.
Room totally sheeted up.
Filled cracks, first coat.
Filled cracks.
Starting to paint 1st coat.
Starting to paint 1st coat, still sheeting up the furniture.
First coat of paint.
Finished coats, Farrell and Ball.
Boarder to be taken off before painting.
Boarder removed and room started painting.
Started painting 1st coat.
Spindles to be painted with Zinsser.
Spindles to be painted white.
Down stairs study finished.
Study finished.
Hallway 1st coat.
Hall, stairs and landing finished.
Hallway finished.
Door finished with Sadolins extra.
Toilet finished.
Toliet finished.
Entrance Hall.
Main Hall.
Top floor landing.
Top floor landing staircase.
Fire place main hall.
Front door.
Main hall.
Windows in the main hall.
Stairs.
Taping up cracks and filling begins.
Front door finished.
Fire place 1st coat.
Top floor 1st coat.
Top floor finished.
Mouldings finished.
Stairs finished.
Windows finished.
Fire place finished.